2 lanes will close on Fort Duquesne Bridge's lower deck

Published May 1, 2010 at 7:00 a.m.
Work will take place from 6 a.m. to noon, and all ramps to and from the bridge will remain open during the routine inspection by SAI Consulting Engineers.


Back | Read more at The Tribune Review

Tagthis You must log in to tag articles
Separate tags with commas
Rate this now!
  • Average rating: 2.3
  • 1
  • 2
  • 3
  • 4
  • 5
Number of ratings: 8 - Average rating: 2.3


Featured Advertiser: